Confirm unit suitability
Dimensions, running condition and vehicle type need review before a method is selected.
EASTBOUND RELAY / RORO
Roll-on/roll-off generally means a vehicle is driven on and off a vessel. Actual availability still depends on the route, vessel and booking acceptance.
Trace route controls ↓
RELAY NODES / 01
Each node names the input that must be resolved before the next handover.

Confirm Northport or Westport.

Class, dimensions and running state.

RORO or container acceptance.

Identity, ownership and authority.

Four corners, cabin and odometer.

Named receiver and optional land scope.
ROUTE NOTES / 02
Dimensions, running condition and vehicle type need review before a method is selected.
RORO does not automatically mean door-to-door. The handover and collection points must be stated.
Schedules change. Use dates only after current operational confirmation.
HANDOVER MAP / 03



ROUTE QUESTIONS / 04
Not necessarily. Availability must be checked against the terminal, vessel and current booking.
That depends on the operator acceptance and handling method for the route.
No. They are different operating methods; suitability depends on the unit and route.
RELAY CHECK / WHATSAPP